1、
While reviewing the estimates from the functional
2、
You are getting project performance information as
3、
To define variance thresholds at designated time p
4、
A project's payback period ends when ().
5、
Earned value technique(EVT)can best be defined as
6、
Which of the following choices indicates that your
7、
A generally accepted method to confirm accuracy of
8、
One common way to compute estimated at completion
9、
All the following are costs incurred to ensure com
10、
Cost control outputs include all of the following
11、
Your company has established a reward and recognit
12、
In the earned value technique, cost variance is co
13、
All of the following are examples of tools often u
14、
A project manager needs to analyze the project cos
15、
Who is responsive for determining the project cost
16、
Which of the following is not estimate costs tool
17、
While completing a project a project manager reali
18、
As a project manager, you examine project results
19、
Analogous estimating ().
20、
What does cost of quality mean ?()
21、
In your construction project, the CPI is 1.30 and
22、
A recommended corrective action is an output of wh
23、
Given: BAC=200, AC=120, EV=80, CPI=0.666. Assuming
24、
The cost management plan has all of the following
25、
After preparing the probability distribution of co
26、
All the following statements relating to Cost Mana
27、
Inputs to determine budget include all of the foll
28、
A project was expected to cost $6 million for 3 mo
29、
The cost baseline has all of the following charact
30、
The () is a time-phased budget that will be used t
31、
The cost reserve should be ().
32、
Rebaselining may be required in cost control when
33、
A projeet team budgeted US $3,000 for the work per
34、
Including a contingency reserve in the project bud
35、
All the following statements about cost baseline a
36、
Of the following estimates, which most accurately
37、
Earned value technique(EVT)is a tool and technique
38、
The measure used to forecast project cost at compl
39、
A project management professional can compare earn
40、
Completion estimate (EAC) is the overall final val
41、
During the sixth monthly update on a ten-month, $3
42、
Company XYZ has a fixed price contract to produce
43、
In your project, there have been several changes
44、
You are a project manager of a small construction
45、
At XYZ Inc. , the hourly wage for semi-skilled wor
46、
Since you are in the preliminary stages of your pr
47、
In your project, you have reason to believe that t
48、
You have recently taken over a new project when th
49、
During execution, a functional manager asks you to
50、
As a project manager, you are aware that estimatin