1、
You got news that because of bad weather, your shi
2、
A project schedule completion date will change if
3、
The critical path is established by calculating th
4、
Activities that are related and shown as a single,
5、
Which of the following techniques is used to contr
6、
The Precedence Diagramming Method provides project
7、
If the number of critical paths in the project inc
8、
Your project is behind schedule due to conflict be
9、
The objective of fast tracking a project is to ___
10、
If you are calculating one early start and early f
11、
All the following are advantages of GERT(graphical
12、
Your schedule analysis has shown that your project
13、
All of the following are true about resource level
14、
All the following statements regarding creating of
15、
In your project, you are using most likely. optimi
16、
A planning package is a ______ .
17、
Activity duration estimate inputs include all of t
18、
Output from the activity resource estimating proce
19、
The project time management processes include ____
20、
The hybrid of a project network diagram and bar ch
21、
An activity has an optimistic estimate of 10 days,
22、
In your project, you realize the importance of det
23、
All the following are benefits of fast tracking a
24、
In your project, you are in the process of creatin
25、
All of the following choices represent inputs to t
26、
Analogous duration estimating is ______ .
27、
As one of the tools and techniques of activity seq
28、
In your project, some requested changes were gener
29、
The “three-point estimates” method for estimating
30、
Rearranging resources so that constant resource le
31、
In roiling wave planning:
32、
The critical chain ______ .
33、
Crashing in time management is ______ .
34、
In schedule development, you create a distribution
35、
Both the CPM and PERT methods assume that estimate
36、
The schedule control process for a project ______
37、
PERT means ______ .
38、
Which of the following is true about critical chai
39、
You have just discovered an error in the implement
40、
In what way does free float differ from total floa
41、
To maintain the customer's schedule, massive overt
42、
Critical chain is a schedule network analysis tech
43、
You work for an architectural-engineering firm and
44、
You have taken information on project scope and re
45、
Resource calendars affect a specific resource or c
46、
Activity definition involves identifying and docum
47、
Upon completing a project schedule, Roberta finds
48、
You work for one of the leading manufactures of co
49、
You are doing a Monte Carlo Analysis in which you
50、
You are working on a software development project.